Monday April 24
The contractor and workers were scheduled to arrive between 7 and 8 a.m. and
start doing preparatory work, but the contractor would not need to speak to us
until around 10:30 which was good because we do not get up too early. At 7:24
someone rang the doorbell. Jeff heard it and decided to ignore it, but Randy
slept through it. The workers started their work. The contractor came back at
about 11:30 and we went over the plans and he painted on the ground where we
wanted things to go. Except the patio. The workers had already put up the
framing for the patio and it looked good. By the end of the day in addition to
the frame for the patio, the frames for some of the paths were done and trenches
for irrigation and drainage had been made, with some pipe laid.
![]() Work begins |
![]() Lines are drawn |
![]() Framed walkway |
![]() Patio goes here |

|